I applied through college or university. The process took 2 days. I interviewed at Accenture in Sep 2014
Interview
Accenture came to recruit in my college and the selection process was divided into 3 rounds.
1) Aptitude
2) GD
3) Technical + HR interview (combined)
Selection process was score based. Scores for Aptitude and GD were added and then elimination was done for the last round.
Aptitude round was easy, with more questions from Venn Diagrams and patterns.
GD round was like a quick fire. I was given 30 seconds to stage my point and 10 seconds to contradict other. If someone fumbled or asked for more time, he was straightaway rejected.
Technical round was mixed. I was asked basic HR questions like relocation, favourite place, likes and dislikes, and also some technical questions on sorting, arrays, prime number identification, basic mathematical computations using structures, and a few more. I guess I wrongly answered one question on pointers.
All in all questions were smooth, and I got selected. Pay package is not disclosed but probably it will be 3.15 LPA. I really expected more from Accenture.
Interview questions [1]
Question 1
A few GD topics were totally discreet for students like - Red and Blue, White shirt and black tie, or black shirt and white tie, and a few more.
It was very structured. It consisted of 1 round. The interviewer asked me to introduce myself and then asked questions on my resume. They are basically looking for candidates to walk through their resume. They didn't ask any question apart from the resume
The process was 1 online assessment and 1 group interview with 3 panelists. They asked both technical and soft skills questions. Each interviewer asked different questions. The total interview was less than 30 mins.
Interview was nice but it was much technical heavy and the interviewer had asked both the technical and HR related questions and also some general knowledge and current affairs questions.
Interview questions [1]
Question 1
Tell me about your college projects and what is your and other team members role in the project