I applied online. The process took 2 days. I interviewed at Ameren (Decatur, IL) in Apr 2023
Interview
I applied and recieved an email to set up phone interview. When discussing relocating/job location, I found out they they don't allow work remote so it was a quick call
Substation Design Engineer applicants have rated the interview process at Ameren with 1 out of 5 (where 5 is the highest level of difficulty) and assessed their interview experience as 100% positive. To compare, the company-average is 64.5% positive. This is according to Glassdoor user ratings.
Candidates applying for Substation Design Engineer roles take an average of 2 days to get hired, when considering 1 user submitted interviews for this role. To compare, the hiring process at Ameren overall takes an average of 38 days.
Common stages of the interview process at Ameren as a Substation Design Engineer according to 1 Glassdoor interviews include:
Phone interview: 100%
Here are the most commonly searched roles for interview reports -