Drilling Engineer applicants have rated the interview process at Devon Energy with 3 out of 5 (where 5 is the highest level of difficulty) and assessed their interview experience as 100% positive. To compare, the company-average is 80% positive. This is according to Glassdoor user ratings.
Candidates applying for Drilling Engineer roles take an average of 10 days to get hired, when considering 3 user submitted interviews for this role. To compare, the hiring process at Devon Energy overall takes an average of 17 days.
Common stages of the interview process at Devon Energy as a Drilling Engineer according to 3 Glassdoor interviews include:
Drug test: 27%
One on one interview: 27%
Background check: 18%
Phone interview: 18%
Group panel interview: 9%
Here are the most commonly searched roles for interview reports -
I applied online. The process took 2 weeks. I interviewed at Devon Energy (Oklahoma City, OK) in Sep 2014
Interview
Submitted application online which was very easy. Contacted within 10 days. Asked to schedule an interview. The day of interview met with 4 different managers and an HR specialist. Devon is very thorough and very easy to talk to. I liked the professionalism of the HR team.
I applied through an employee referral. The process took 1 day. I interviewed at Devon Energy (Oklahoma City, OK) in Apr 2014
Interview
All behavioral questions. Questions regarding the work you have done in the past, how well you work with teams, challenges you have overcome, how you handle disagreements, times you have failed and how have you moved past those challenges.
I applied online. The process took 2 weeks. I interviewed at Devon Energy (Oklahoma City, OK) in Dec 2013
Interview
Applied Online. 1st contact was by HR through phone to schedule a 1st phone interview. Next day, 1st phone interview was technical. Next day 2nd interview was scheduled for the following day at the company HQ in OKC. 2nd interview was several rounds: HR > Job Requisitioner > SME > Recruiter.
Interview questions [1]
Question 1
Typical HR question but SME dug into details of drilling engineering such as experience with Torque and Drag models. MWD/LWD/DD basics. Casing design basics. Software experience was also discussed.