Scary but positive results in that the recruiting team was there to greet me, and I was familiar with the plans provided and the type of construction proposed being a tie-back retaining wall system where there had been a severe storm that caused erosion and eradication of existing soils in the fill slope with existing roadway damages. The road provided access to the existing reservoir at a higher elevation.