I applied through an employee referral. The process took 2 months. I interviewed at Sandvik in Jan 2015
Interview
Technical, UG/NX, Minin Equipments, Heavy Industry, Structural Analysis, Team centre, Hydraulics, Power packs, Gd&T, Project Lead, Team Mangament, ECN/ECm process, New product Development, Drafting and Drawings, tool test,drawing reading, basics mechanics, dfma, design review, parts and weldment drawings