Senior Piping Designer Interview Questions

27 senior piping designer interview questions shared by candidates

Familiarity with industry codes (like ASME, ANSI, etc.) How you use design software (e.g., AutoCAD Plant 3D, SmartPlant, PDMS) Considerations for space, maintenance, safety, and process flow How you work with other disciplines (mechanical, structural, process engineers)
avatar

Senior Piping Designer

Interviewed at PM Group

4
Jun 3, 2025

Familiarity with industry codes (like ASME, ANSI, etc.) How you use design software (e.g., AutoCAD Plant 3D, SmartPlant, PDMS) Considerations for space, maintenance, safety, and process flow How you work with other disciplines (mechanical, structural, process engineers)

Asked questions relate to piping design, working experiences, type off design involved with, willing to work abroad, how to generate drawings and work extra times. Describe nature off works with previous company and pervious company history. Provided documents as certificates and payslip.
avatar

Senior Piping Designer

Interviewed at Amec Foster Wheeler

3.3
Mar 5, 2016

Asked questions relate to piping design, working experiences, type off design involved with, willing to work abroad, how to generate drawings and work extra times. Describe nature off works with previous company and pervious company history. Provided documents as certificates and payslip.

What was unexpected was the fact that a live PDMS test was actually given by their administrator. Interestingly enough, the test only lasted maybe 3 minutes as he stopped me after plainly seeing I knew how to route piping using the software.

Senior Piping Designer

Interviewed at Sbm/Imodco

4.2
Dec 26, 2012

What was unexpected was the fact that a live PDMS test was actually given by their administrator. Interestingly enough, the test only lasted maybe 3 minutes as he stopped me after plainly seeing I knew how to route piping using the software.

FAST-TREK PROJECT FOR DETAILED DESIGN Liaise with other departments, clients, vendors, subcontractors and third parties as required by the project. Responsible for the manhour & schedule monitoring and control and quality of the work produced. Insure design team skill levels required to ensure smooth execution of the project
avatar

SENIOR PIPING DESIGNER/PDMS

Interviewed at Technip

3.8
Aug 23, 2014

FAST-TREK PROJECT FOR DETAILED DESIGN Liaise with other departments, clients, vendors, subcontractors and third parties as required by the project. Responsible for the manhour & schedule monitoring and control and quality of the work produced. Insure design team skill levels required to ensure smooth execution of the project

Viewing 11 - 20 interview questions

Glassdoor has 27 interview questions and reports from Senior piping designer interviews. Prepare for your interview. Get hired. Love your job.