Mad hours. Especially being a rail loader. The schedule hours are 7-330 pm, but it’s really until the job is done.
If we have 36 train cars (empty) with a crew of at least 5-6 loaders it can be done in 9-10 hours, but if it’s 36 train cars and 36 offloads that’s where it gets bad, because you have to offload the cars on the train( including un chalking the tires, then have to drive them off the train on the top and bottom it’s a double level train then you have to load them. So one track loading and unloading can take 2-3 hours and after that you still have 30 rail cars too offload and load.